Thailand Accelerates Double-Track Rail Project from Den Chai to Chiang Khong
Thai PBS

Key summary
The Ministry of Transport in Thailand is accelerating construction on the double-track railway line connecting Den Chai, Chiang Rai, and Chiang Khong. Deputy Minister Jirapong Thep Pitak visited the project site alongside Chiang Rai Governor Chu Chup Phongsai to address local concerns regarding traffic congestion and safety. Currently 72 percent complete with a total length of 323.10 kilometers, the project is scheduled for completion in 2071. Officials emphasized resolving land delivery issues and ensuring environmental standards are met while improving road safety measures.
M31 has compiled the key facts based on reporting from the source below. Please refer to the original article for details.
This article was restructured with AI-assisted translation and may contain errors. Please refer to the original source below for accuracy.
Source report
Thai PBS
Read original ↗https://www.thaipbs.or.th/news/content/571063